Global sourcing
Three regional desks work the same request in parallel, so a part that is allocated in one market is still being chased in another.
EV charging infrastructure is rolled out against fixed deployment milestones and must operate reliably in demanding outdoor conditions. Component shortages or delays can disrupt installation schedules and slow network expansion.
Tradius supports EV charging manufacturers, infrastructure providers, OEMs and EMS providers with global sourcing solutions designed to maintain deployment schedules, production continuity and supply chain reliability.
Requests are worked across the Americas, EMEA and APAC in parallel, and every source is qualified before anything is bought on your behalf.

Each of these is a reason a request reaches our desk. The route out is different for each.
Allocation on a single part number is enough to hold up an entire build.
A lead time measured in quarters cannot carry a build schedule measured in weeks.
The product is still being built long after the component left the catalogue.
Wafer and packaging capacity moves on a different clock than programme planning.
Capacity plans move, and the parts list has to move with them.
A component that exists but cannot move is, on the floor, still a shortage.
We understand the importance of quality systems, traceability and component reliability within EV charging infrastructure.
Our sourcing approach supports customers building equipment for demanding outdoor environments where reliability, thermal performance and long-term availability are critical.
EV charging components can face extended manufacturing lead times and allocation as charging networks scale and demand for high-power electronics increases.
Our global sourcing network helps identify verified alternative supply sources when traditional channels cannot meet production or deployment schedules.
Three regional desks work the same request in parallel, so a part that is allocated in one market is still being chased in another.
Alternative sources are qualified and their documentation checked before anything is bought on your behalf.
Obsolete, end-of-life and last-time-buy components located worldwide, with traceability documented before purchase.
Consolidation, volume leverage and approved alternatives, weighed against what the programme is allowed to change.
Suppliers are qualified, paperwork verified and risk assessed before purchase.
Buffer stock and scheduled call-offs built around your line, so a change in volume does not become a shortage.

Grid, storage and renewables projects built on decade-long service commitments.
Power modules · Sensors + more
OEM, Tier 1 and Tier 2 programmes where a single missing part can stop a line.
MCU · IGBT · Sensors + more
Access, climate and safety systems that stay in a building long after the components ship.
PLC · Sensors · I/O + moreFrom component shortages and obsolete parts to complete BOM requirements, our specialists connect your needs with the right supply through our global network.
Send us your requirements, and a sourcing specialist will review your request and contact you shortly. Urgent requests are supported 24/7.
Leave your details and attach the file. A sourcing specialist reviews it and comes back to you.
Choose a time that works for you and a Tradius specialist will call you back.